⚙
Basic Information
Surface Treatment
Hard Anodizing
Production Type
Mass Production
Machining Method
CNC Machining
Material
Steel, Plastic, Brass, Alloy, Copper, Aluminum, Iron
Production Capacity
50000 Pieces/Year
❓
Frequently Asked Questions
Q1: What quality certifications do you hold?
We are ISO 9001: 2015 certified, ensuring high-standard quality management systems.
Q2: What is the typical lead time for quotes and production?
Quotes are provided within 24-48 hours. Production lead time is typically 1-2 weeks for samples and 3-4 weeks for mass production depending on complexity.
Q3: What manufacturing equipment is available?
Our facility is equipped with 26 CNC Machining Centers, 18 CNC Turning Machines (Lathes), and 8 Automatic Lathes.
Q4: Do you provide samples before mass production?
Yes, we provide samples for evaluation. Costs depend on part complexity and may be refundable upon production orders. Sample lead time is 1-2 weeks.
Q5: What are the accepted payment terms?
We accept T/T, PayPal, and Western Union. For orders over USD 5,000, we typically require a 60% deposit and 40% before shipment.
Q6: Which file formats are accepted for drawings?
We accept STP, STEP, LGS, XT, AutoCAD (DXF, DWG), and PDF formats, or physical samples.